Municipal Solid Waste Landfill  – Grosseto (GR)

  •  Installation: 2014
  • Reverse Osmosis Plant with 2 stages of treatment
  • Installation in a shed dedicated to the plant
  • Treatment capacity: 110 mc/day
  • Discharge of the purified water into surface water