Landfill RSU – Arma di Taggia (IM)

  • Installation: 2018
  • Reverse Osmosis Plant with 2 stages of treatment
  • Treatment capacity: 100 m3/day
  • Installed in 1 insulated container
  • Permeate discharge in surface water