Landfill for municipal solid waste – Borgo Montello (LT)

  • Installation: 2019
  • Reverse Osmosis Plant with 3 stages of treatment
  • Treatment capacity: 50 m3/day
  • Permeate discharge in surface water (tab. 3 del D. Lgs. 152/06)